RE: East side of Glass Bowl renovation/construction thread
Weird because the story on the bridge opening says the sidewalks are 6 feet wide. It didn't say whose feet, though.
|
|
08-08-2016 08:43 PM |
|
T-Town
All American
Posts: 4,061
Joined: May 2002
Reputation: 20
I Root For:
Location:
|
RE: East side of Glass Bowl renovation/construction thread
(07-31-2016 05:06 PM)indianasniff Wrote: Personally I think they should be removed. Perfect location for premium end zone seating.
Sent from my iPhone using Tapatalk
Sounds reasonable, EXCEPT the current east side renovation seems to suggest that the objective of their master plan is to REMOVE premium seating, not CREATE it.
|
|
08-08-2016 08:50 PM |
|
indianasniff
All American
Posts: 3,841
Joined: Dec 2012
Reputation: 26
I Root For: Toledo
Location:
|
RE: East side of Glass Bowl renovation/construction thread
(08-08-2016 06:27 PM)Boca Rocket Wrote: (08-08-2016 06:06 PM)DetroitRocket Wrote: Walked across the Root Bridge today. The sidewalk can't be more than four feet wide, likely less.
They didn't look very wide.
There are two things that would be helpful for this thread. Your phone camera and the Tapatalk app and a measuring tape.
When I asked the PM about it he said 5 feet....
(This post was last modified: 08-09-2016 08:24 AM by indianasniff.)
|
|
08-09-2016 08:23 AM |
|
Boca Rocket
Legend
Posts: 25,686
Joined: Mar 2004
Reputation: 108
I Root For:
Location:
|
RE: East side of Glass Bowl renovation/construction thread
(08-09-2016 08:23 AM)indianasniff Wrote: (08-08-2016 06:27 PM)Boca Rocket Wrote: (08-08-2016 06:06 PM)DetroitRocket Wrote: Walked across the Root Bridge today. The sidewalk can't be more than four feet wide, likely less.
They didn't look very wide.
There are two things that would be helpful for this thread. Your phone camera and the Tapatalk app and a measuring tape.
When I asked the PM about it he said 5 feet....
Be nice to have a footbridge next to it, just to keep pedestrians away from the traffic during peak usage.
|
|
08-09-2016 08:35 AM |
|
San Giuseppe Jato Rocket
1st String
Posts: 1,352
Joined: Oct 2005
Reputation: 8
I Root For: il Rockets
Location: 71 Battery St~Boston
|
RE: East side of Glass Bowl renovation/construction thread
Update?
|
|
08-23-2016 09:00 PM |
|
inductchuck16
Heisman
Posts: 5,823
Joined: Feb 2011
Reputation: 26
I Root For: Toledo Rockets
Location:
|
RE: East side of Glass Bowl renovation/construction thread
(08-23-2016 09:00 PM)San Giuseppe Jato Rocket Wrote: Update?
Looks about the same as the last photos we saw.
|
|
08-23-2016 10:52 PM |
|
H2Oville Rocket
Legend
Posts: 26,396
Joined: Jun 2005
Reputation: 127
I Root For: Toledo R0ckets
Location:
|
RE: East side of Glass Bowl renovation/construction thread
I can verify that it will support a pickup truck, a hefty guy and a large Labrador. Looks nice, too.
|
|
08-24-2016 05:37 AM |
|
indianasniff
All American
Posts: 3,841
Joined: Dec 2012
Reputation: 26
I Root For: Toledo
Location:
|
East side of Glass Bowl renovation/construction thread
Fascinating the amount of posts we have with no pics on this topic
Take a pic and post.
Sent from my iPhone using Tapatalk
(This post was last modified: 08-24-2016 06:06 AM by indianasniff.)
|
|
08-24-2016 06:04 AM |
|
Toledo Football 1st
All Rockets All The Time
Posts: 13,384
Joined: May 2002
Reputation: 54
I Root For: T O L E D O
Location: Rocket Nation
|
RE: East side of Glass Bowl renovation/construction thread
I forgot to take my camera again (drrrr....) but I was there yesterday. So here's a little summary:
- Make no mistake, there is still plenty to do, but things are taking shape.
- They were pouring more concrete yesterday. I would say the concrete work is 90% done, maybe 100% today.
- The stone pillars have good sized lighting scones attached to them which look pretty good.
- The iron fencing is not up yet, but they have set steel posts, one on each side of each stone pillar, to attach the fencing to.
- At the top of the steps they have put in a retaining wall so that the slab could be extended out toward the road a little further than it was.
- They were installing some steel railing along the edge of the slab toward the road. Couldn't tell for sure if it was stainless or galv'd to be painted.
- They were doing some repair work on the old railing, welding some cracks maybe. There was also some welding going on under the stands.
- They were doing some fill and grading work on the slope along the road.
- The addition for the restrooms is painted now. It is painted a sand color to match the stonework, but it does have a horizontal midnight blue stripe.
- The doors are now installed on the addition.
- There are ticket booths integrated in the two corners of the side of the addition which faces toward the road.
I may run back over today or tomorrow. If I do I'll try to remember to take my camera.
|
|
08-24-2016 09:37 AM |
|
Stpetebeachrocketfan
1st String
Posts: 1,147
Joined: Mar 2012
Reputation: 7
I Root For: Toledo
Location:
|
RE: East side of Glass Bowl renovation/construction thread
(08-24-2016 09:37 AM)Toledo Football 1st Wrote: I forgot to take my camera again (drrrr....) but I was there yesterday. So here's a little summary:
- Make no mistake, there is still plenty to do, but things are taking shape.
- They were pouring more concrete yesterday. I would say the concrete work is 90% done, maybe 100% today.
- The stone pillars have good sized lighting scones attached to them which look pretty good.
- The iron fencing is not up yet, but they have set steel posts, one on each side of each stone pillar, to attach the fencing to.
- At the top of the steps they have put in a retaining wall so that the slab could be extended out toward the road a little further than it was.
- They were installing some steel railing along the edge of the slab toward the road. Couldn't tell for sure if it was stainless or galv'd to be painted.
- They were doing some repair work on the old railing, welding some cracks maybe. There was also some welding going on under the stands.
- They were doing some fill and grading work on the slope along the road.
- The addition for the restrooms is painted now. It is painted a sand color to match the stonework, but it does have a horizontal midnight blue stripe.
- The doors are now installed on the addition.
- There are ticket booths integrated in the two corners of the side of the addition which faces toward the road.
I may run back over today or tomorrow. If I do I'll try to remember to take my camera.
Thank you so much for the update! Please take and post lots of pics!
|
|
08-24-2016 10:17 AM |
|
indianasniff
All American
Posts: 3,841
Joined: Dec 2012
Reputation: 26
I Root For: Toledo
Location:
|
East side of Glass Bowl renovation/construction thread
Sounds like a nice improvement
Sent from my iPhone using Tapatalk
|
|
08-24-2016 10:57 AM |
|
Rocket65
2nd String
Posts: 374
Joined: Dec 2003
Reputation: 9
I Root For: UT RRRRRRockets
Location:
|
RE: East side of Glass Bowl renovation/construction thread
Drove by the stadium this afternoon. All of the exposed steel work has now been painted midnight blue. Looks great.
Sorry, no pics.
|
|
08-24-2016 06:12 PM |
|
Toledo Football 1st
All Rockets All The Time
Posts: 13,384
Joined: May 2002
Reputation: 54
I Root For: T O L E D O
Location: Rocket Nation
|
RE: East side of Glass Bowl renovation/construction thread
(08-24-2016 10:17 AM)Stpetebeachrocketfan Wrote: Thank you so much for the update! Please take and post lots of pics!
CLICK HERE FOR EYE CANDY
Note that you should be able to adjust the speed of the slideshow and there is a pause control off to the lower left.
Also, here are a couple video sweeps I did:
SWEEP 1
SWEEP 2
|
|
08-24-2016 09:36 PM |
|
Boca Rocket
Legend
Posts: 25,686
Joined: Mar 2004
Reputation: 108
I Root For:
Location:
|
RE: East side of Glass Bowl renovation/construction thread
Need to get the landscapers going.
|
|
08-25-2016 01:41 AM |
|
Stpetebeachrocketfan
1st String
Posts: 1,147
Joined: Mar 2012
Reputation: 7
I Root For: Toledo
Location:
|
RE: East side of Glass Bowl renovation/construction thread
(08-25-2016 01:41 AM)Boca Rocket Wrote: Need to get the landscapers going.
Some landscaping and the new iron fence should look real good. The bathroom on the south end looks huge!
|
|
08-25-2016 07:06 AM |
|
indianasniff
All American
Posts: 3,841
Joined: Dec 2012
Reputation: 26
I Root For: Toledo
Location:
|
East side of Glass Bowl renovation/construction thread
Talent is amazing. I knew it could be done. Thanks for the pics. Nice touch on the Maine sign
Sent from my iPhone using Tapatalk
|
|
08-25-2016 07:08 AM |
|
indianasniff
All American
Posts: 3,841
Joined: Dec 2012
Reputation: 26
I Root For: Toledo
Location:
|
East side of Glass Bowl renovation/construction thread
|
|
08-25-2016 09:57 AM |
|
huskiebob
Heisman
Posts: 8,528
Joined: Nov 2004
Reputation: 44
I Root For: NIU Huskies
Location: The Space Coast
|
RE: East side of Glass Bowl renovation/construction thread
Very nice. One of the best stadiums in the MAC is gonna be even better!
|
|
08-25-2016 11:13 AM |
|
Toledo Football 1st
All Rockets All The Time
Posts: 13,384
Joined: May 2002
Reputation: 54
I Root For: T O L E D O
Location: Rocket Nation
|
RE: East side of Glass Bowl renovation/construction thread
|
|
08-25-2016 11:55 AM |
|
Stpetebeachrocketfan
1st String
Posts: 1,147
Joined: Mar 2012
Reputation: 7
I Root For: Toledo
Location:
|
RE: East side of Glass Bowl renovation/construction thread
(08-25-2016 11:55 AM)Toledo Football 1st Wrote: (08-25-2016 09:57 AM)indianasniff Wrote: https://twitter.com/toledorockets/status...6055085057
Sent from my iPhone using Tapatalk
Huge toilet stalls with shoe storage and hanging rods. That must be the Ladies.
That is photos of the remodeled visitors locker room for football.
|
|
08-25-2016 12:06 PM |
|